CoveKinloch
  • Our Services
    • Building Consulting
      • Building Consent Support
      • Indoor Air Quality Testing
      • Exterior Cladding Reports
      • Timber Decay Identification
      • Technical Due Diligence
      • Schedule of Reinstatement/ Dilapidation
      • Premises Condition Report
      • Long-Term Maintenance Plans
      • Construction Observation / Clerk of Works
      • Building Regulatory Technical Advice
      • Building Condition Report
    • Fire Engineering
      • Accessibility Reports
      • Passive Fire Audits
      • Fire Engineering and Fire Design
    • Accessibility Reports
    • Building Consent Support
  • About Us
  • News & Insights
  • Contact Us
Select Page
Lithium-Ion Batteries – Potential of Fire Risk?

Lithium-Ion Batteries – Potential of Fire Risk?

by Anne Fenwic | 11 Nov 2024 | Fire Engineering

Lithium-ion (commonly referred to as Li-ion) batteries are a cornerstone of 21st century civilisation, necessitated by the ever-increasing demand for dense energy storage – particularly for EVs, scooters, bikes, tools; virtually all consumer electronics. Consequences...
Considerations for Obtaining a Commercial Building Consent

Considerations for Obtaining a Commercial Building Consent

by Anne Fenwic | 1 Nov 2024 | Compliance

For all non-residential building consent applications, it is crucial to have all the required documentation collated to ensure a seamless vetting process, and subsequent consenting process. Good documentation will avoid or minimise ‘Requests for Information (RFIs)’...
Unoccupied Iconic New Zealand Buildings

Unoccupied Iconic New Zealand Buildings

by Anne Fenwic | 15 Oct 2024 | Building Consulting, Compliance

Did you know New Zealand has multiple iconic heritage and other buildings sitting empty and unoccupied. The primary reason is their seismic assessment rating and ultimate designation by their local territorial authority as being earthquake prone. However, other older...
Do not let regulatory surprises impact the sale process and price of your commercial property.

Do not let regulatory surprises impact the sale process and price of your commercial property.

by Anne Fenwic | 11 Sep 2024 | Uncategorized

Let us review your property files. We urge owners and managers of any form of commercial property, large or small to review their council property file and LIM to identify any anomalies so they can be resolved in good time and not within a high-pressure transactional...
How hard is it to build housing for disabled people?

How hard is it to build housing for disabled people?

by Anne Fenwic | 3 Nov 2023 | Uncategorised

It is great to see a serious focus from The Kirva Trust in providing suitable social housing for people with disabilities in this Wellington new build: https://www.thepost.co.nz/nz-news/350103322/disabled-people-welcome-social-housing-complex. Our team of...
« Older Entries

Recent Posts

  • Congratulations To Our Newly Appointed Senior Associates
  • Welcome Linxuan Jiang, The Newest Member of Our Fire Engineering Team
  • Lithium-Ion Batteries – Potential of Fire Risk?
  • Considerations for Obtaining a Commercial Building Consent
  • Unoccupied Iconic New Zealand Buildings

Recent Comments

No comments to show.
covekinloch

CONTACT US

0800 268 354

info@covekinloch.co.nz

Request an offer of service

HOMEPAGE

Fire Engineering

Building Consulting

Accessibility Reports

Building Consent Support

sitesafe
sitewise