Exterior Cladding Reports

 

 

 

Site Inspections

Exterior Cladding Reports

Exterior Cladding Reports

Changes made to the New Zealand Building Code in the late 1990s, together with a shift in industry delivery standards, led to what is known as the ‘Leaking Building Crisis’.

The weathertightness problem arises with a combination of all or some of the following factors: untreated timber framing, lack of a self-draining cavity system, monolithic cladding systems, lack of flashings, poor quality construction detailing and architectural design features that encourage rather than deter moisture entry.

These leaking buildings require refurbishment. Targeted repair (partial recladding), on balance, is an inappropriate solution. These buildings carry a stigma and are generally either remediated by the owner or on sold at significant discount.

 
 

Get in touch if you have questions or would like to discuss your project with us.

Contact us for an offer of service and we'll have it ready for you within 2-3 days.